Carbon Capture Project
Under construction · Nebraska · Last reported Feb 2025
Source: GlobeNewswire
POET and Tallgrass have entered into agreements to connect POET’s Fairmont, Nebraska bioprocessing facility to the Tallgrass Trailblazer carbon dioxide pipeline. This project will capture bioCO2 for transportation and permanent underground sequestration in Wyoming, enhancing the sustainability of bioethanol production.
- Status
- Under Construction
- Location
- Fairmont, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- GlobeNewswire
ConstructChat
Ask ConstructChat about Carbon Capture Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | POET and Tallgrass have entered into agreements to connect POET’s Fairmont, Nebraska bioprocessing facility to the Tallgrass Trailblazer carbon dioxide pipeline. This project will capture bioCO2 for transportation and permanent underground sequestration in Wyoming, enhancing the sustainability of bioethanol production. |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Fairmont |
Source
Source | GlobeNewswire |
URL |
More Details
Record type | Project |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
