Cardinal South Mixed Use Development
Delayed · Ohio · Last reported Dec 2023
Source: Dodge USA
For sale, for rent, office and possible small retail component in-house with a public gym (The Atletic) and a Cafe /Bar (Bada Bean Bada Booze) - 100 +/- for sale units with a mix of townhomes and flats 3-4 stories - 715+/- apartments both walk up and corridor units 4-5 stories - 200,000 sq/ft +/- office space that will be 3-4 stories
- Status
- Failure
- Sector
- Commercial, Consumer Products, Residential, Manufacturing (Industrial)
- Location
- Dublin, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cardinal South Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Delayed |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | For sale, for rent, office and possible small retail component in-house with a public gym (The Atletic) and a Cafe /Bar (Bada Bean Bada Booze) - 100 +/- for sale units with a mix of townhomes and flats 3-4 stories - 715+/- apartments both walk up and corridor units 4-5 stories - 200,000 sq/ft +/- office space that will be 3-4 stories |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Dublin |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Consumer Products, Residential, Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
