Career Pathways ( Allied Health Bldg ) Phase 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
GENERAL PROJECT OUTLINE : one 2-story /- 39,300 GSF Allied Health building, one 2-story 25,000 GSF Aeronautics building, renovation of E welding building, abatement,and demolition of E buildings, surface parking and associated siteimprovements. Construction is scheduled to commence Winter 2023 and completion of the projectspring 2026. Scope of work currently prequalifying: des/bld BP07B Formed Met
- Status
- Prospective
- Sector
- Metal, Education, Steel, Commercial, Car parking, Government, Automotive
- Location
- San Bernardino, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Career Pathways ( Allied Health Bldg ) Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GENERAL PROJECT OUTLINE : one 2-story /- 39,300 GSF Allied Health building, one 2-story 25,000 GSF Aeronautics building, renovation of E welding building, abatement,and demolition of E buildings, surface parking and associated siteimprovements. Construction is scheduled to commence Winter 2023 and completion of the projectspring 2026. Scope of work currently prequalifying: des/bld BP07B Formed Metal Wall Panels/BP14 Passenger Elevator/ BP31B SpecialFoundations - end scope currently prequalifying |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Bernardino |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Steel, Commercial, Car parking, Government, Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
