CARIBBEAN ISPAT LTD
Completed · Trinidad and Tobago
Source: International Finance Corporation (IFC)
- 2 -SUMMARY OF PROJECT INFORMATION (SPI)Project name Trinidad & Tobago - Caribbean Ispat LimitedRegion Latin America and CaribbeanSector ManufacturingProject No. 004653Projected Board Date June 19, 1995Company Name Caribbean Ispat LimitedTechnical Partner and/or Major ShareholdersMr. L. N. Mittal, representative of the Mittal family, through Seolak Investment Ltd. (British Virgin Islands) 100%.Pr
- Status
- Closed
- Sector
- Waste Processing and Treatment, Biomass, Water Supply and Storage, Metal, Steel, Government, Manufacturing (Industrial), Commercial
- Location
- Trinidad and Tobago
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about CARIBBEAN ISPAT LTD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | - 2 -SUMMARY OF PROJECT INFORMATION (SPI)Project name Trinidad & Tobago - Caribbean Ispat LimitedRegion Latin America and CaribbeanSector ManufacturingProject No. 004653Projected Board Date June 19, 1995Company Name Caribbean Ispat LimitedTechnical Partner and/or Major ShareholdersMr. L. N. Mittal, representative of the Mittal family, through Seolak Investment Ltd. (British Virgin Islands) 100%.Project Cost Including proposed IFC investmentUS$147.4 million, of which IFC’s investment is US$27.3 million.Location of project and Description of SitePoint Lisas Industrial Estate, Trinidad and Tobago, West Indies.Description of Company and Purpose of ProjectThe Project is the first integrated steel producing company in Trinidad & Tobago and consists of the production and environmental upgrade of the Caribbean Ispat Limited steel making facility that was purchased from the Government of the Republic of Trinidad and Tobago on December 30, 1994. The plant is integrated, comprising gas based direct reduction iron (DRI) 840,000 mty, an electric arc furnace (EAF) type steel melt shop of 600,000 mty, a wire rod mill of 420,000 mty and ancillary facilities. The production upgrade would increase output of the facility to 1,168,000 mty of DRI, 1,000,000 mty of billets and 734,000 mty of wire rods as well as result in net efficiency and throughput savings of about $24/mt on the wire rods.Environmental Category and IssuesThis is a category “B” project according to IFC’s environmental review procedure. Environmental andoccupational and health issues associated with this project include air emission control, solid waste management, wastewater management and use of effluent for irrigation, resource recovery, general employee health and safety and environmental monitoring and reporting program. CIL will improve emission control by investing in increased fan capacities, introduction of scrubbers, upgrade or replace missing equipment, install primary and secondary emissions control systems and introduce disposal of the pelletized electric arc furnace dust. The improvements will bring the air emissions from CIL in compliance with World Bank guidelines. A dedicated landfill will be introduced to avoid dust emission from dried sludge disposal. CIL will improve the quality of wastewater and run-off water. The improvements will bring the effluent water from CIL in compliance with local requirements and World Bank guidelines. The effluent will be used for irrigation in greenbelt development within the plant boundary. A secondary screening system will be installed to recover and recycle oxide dust from the direct reduction plant. The project improvements will significantly improve the occupational health and safety at the plant. Finally, CIL will implement an environmental monitoring and reporting and program to verify ongoing compliance with applicable environmental standards. IFC will ensure ongoing compliance with World Bank guidelines during the life of the project by evaluating monitoring reports submitted annually to IFC by Caribbean Ispat Ltd. and by conducting periodic supervision.The Environmental Review Summary is available from the Public Information Center on or about May 20, 1995.Host country location(s) of environmental documents: Iscott Complex, P.O. Box 476, Point Lisas, Couva, Trinidad & TobagoDate SPI sent to PIC May 19, 1995For Additional Information contact: Corporate Relations Unit - telephone: (202) 473-7711,facsimile: (202) 676-0365Environmental documents for this project are available at http://www.ifc.org and from the World Bank InfoShop (http://www.worldbank.org/html/pic/aboutinfo.html). |
Original sector | AB - Integrated Steel Works |
Location
Country | Trinidad and Tobago |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Biomass, Water Supply and Storage, Metal, Steel, Government, Manufacturing (Industrial), Commercial |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Trinidad and Tobago
- Establishing a Joint Venture/Development of a new project/Agriculture, hunting and forestry/Pinnacle Farm West Indies Limited
- Environmental Protection & Rehabilitation Program
- Trinidad and Tobago Organic Waste Municipal Curbside Recycling Programme (MCRP)
- National Integrated Solid Waste Management Strategy
- Catalyzing And Connecting The Circular Economy In Trinidad And Tobago
- Unicell Paper Mills Caribbean Ltd. (UPMCL)
- Trinidad and Tobago: Nariva ecosystem restoration and carbon sequestration
- University of the West Indies-Institute of Business
