logo

Carlos Lleras Restrepo Hydro Power Plant

Sector: Commercial • Location: Colombia

Source: World Bank Group

Project
Active

In December 2012, Hidroelectrica del Alto Porce SAS (Hidralpor), a subsidiary of the Colombian company Mincivil, was granted the right to build and operate a run-of-river hydro power plant located in the Aburra River, Department of Antioquia. The sponsor committed to start supplying all its power to the national grid in December 2015 through a connection with Empresa Publica de Medellin (EPM)'s n

Project Information FAQ

Project Information

5 Q
The project “Carlos Lleras Restrepo Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In December 2012, Hidroelectrica del Alto Porce SAS (Hidralpor), a subsidiary of the Colombian company Mincivil, was granted the right to build and operate a run-of-river hydro power plant located in the Aburra River, Department of Antioquia. The sponsor committed to start supplying all its power to the national grid in December 2015 through a connection with Empresa Publica de Medellin (EPM)'s network. The sponsor took part in an auction for the sale of electricity in December 2011 offering a tariff of US$ 15.7/MWh. The power plant was named Carlos Lleras Restrepo Hydro Power Plant (78.2 MW). The sponsor committed to invest US$ 206.6 million in the construction of the power plant. As of October 2014, 78.6% of the construction works were concluded. The environmental license was issued in August 2011. In October 2012, the sponsor applied for carbon credits.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data