logo

Carlotta Storm Sewer

Sector: Water Supply and Storage • Location: Brown Deer, Wisconsin, United States of America

Source: Dodge USA

Project
Closed

The installation of 360 linear feet of 18-inch diameter HDPE storm sewer, flare end sections, and two ADS structures. The project will include sod restoration and rip rap placement at the outlets of the pipes.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Brown Deer, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Carlotta Storm Sewer

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Carlotta Storm Sewer” is an infrastructure initiative in the Water Supply and Storage sector, located in Brown Deer, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The installation of 360 linear feet of 18-inch diameter HDPE storm sewer, flare end sections, and two ADS structures. The project will include sod restoration and rip rap placement at the outlets of the pipes.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Brown Deer

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-09-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project