Carlton Reservoir Rehabilitation
Sector: Waste Processing and Treatment • Location: North Las Vegas, Nevada, United States of America
Source: Dodge
Design, repair, upgrade and recoat Carlton Reservoir #2. This reservoir is 7,500,000 million gallon tanks. The tank was taken off-line 3 years ago due to its deteriorating condition. The floors of the tank will need to be replaced, recoated, and upgraded with new Cathodic projection, new mixers, new valves, and other modifications to keep up with AWWA code. Tanks usually have to be recoated and re
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Commercial, Government
- Location
- North Las Vegas, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Carlton Reservoir Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design, repair, upgrade and recoat Carlton Reservoir #2. This reservoir is 7,500,000 million gallon tanks. The tank was taken off-line 3 years ago due to its deteriorating condition. The floors of the tank will need to be replaced, recoated, and upgraded with new Cathodic projection, new mixers, new valves, and other modifications to keep up with AWWA code. Tanks usually have to be recoated and repaired every 20 years. The City of North Las Vegas may be seeking a consultant to provide design ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | North Las Vegas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
