logo

Carmel Church Data Hub Campus Master Report

Sector: Car parking • Location: Ruther Glen, Virginia, United States of America

Source: Dodge USA

Project
Construction Documents

Applicant is proposing the development of a phased data center campus with approx. 1,600,000 million square feet of facilities within five buildings on 97 acres of a 256 acre parcel. Phase 1 will consist of two buildings , approx. 630 square feet, each about 315,000 square feet. There will be an electrical substation located on approx. 10 acres. the data centers are designed to be two story buildi

Status
Closed
Sector
Car parking, Power Generation (CCGT), Data Center, Residential, Commercial, Automotive
Location
Ruther Glen, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Carmel Church Data Hub Campus Master Report

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Carmel Church Data Hub Campus Master Report” is an infrastructure initiative in the Car parking sector, located in Ruther Glen, Virginia, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Applicant is proposing the development of a phased data center campus with approx. 1,600,000 million square feet of facilities within five buildings on 97 acres of a 256 acre parcel. Phase 1 will consist of two buildings , approx. 630 square feet, each about 315,000 square feet. There will be an electrical substation located on approx. 10 acres. the data centers are designed to be two story buildings with administrative office space, generator yards., loading docks, and required parking. The ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Ruther Glen

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Car parking, Power Generation (CCGT), Data Center, Residential, Commercial, Automotive

Article published date

2024-12-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project