Carolan Avenue Complete Streets, City Project No. 83680
Sector: Automotive • Location: Burlingame, California, United States of America
Source: City of Burlingame
City Project No. 83680 This project provides benefits to vehicles, bicyclists, and pedestrians along this busy corridor. Bicyclists were provided with two dedicated bike lanes on either side of the road and a 3' buffer from vehicles. The pedestrian improvements included new bulb outs at the intersection corners and a crosswalk at Morrell Avenue. The new bulb outs and crosswalk improved the crossin
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | City Project No. 83680 This project provides benefits to vehicles, bicyclists, and pedestrians along this busy corridor. Bicyclists were provided with two dedicated bike lanes on either side of the road and a 3' buffer from vehicles. The pedestrian improvements included new bulb outs at the intersection corners and a crosswalk at Morrell Avenue. The new bulb outs and crosswalk improved the crossing to the nearby train tracks. The community will benefit from the reduced speeds on this partial residential street. Rain gardens were also added to reduce and treat stormwater. Scope : The City of Burlingame modified Carolan Avenue between Broadway and Oak Grove Avenue from a four-lane roadway (two lanes in each direction) with Class III bicycle routes into a two-lane roadway with a third center turn-lane and new Class II dedicated bicycle lanes. Project work included removal of existing lane striping, full roadway resurfacing, installation of new lane striping, updating existing ADA ramps, installation of new ADA ramps, removal of in-pavement crosswalk lighting and replacement with flashing beacons and new marked crosswalks, construction of bulb-out curbs with associated storm drainage facilities, and landscaping. Plan Holders List Bid Summary |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
