Caroline County Courthouse Clocktower Restoration
Sector: Metal • Location: Denton, Maryland, United States of America
Source: Dodge
The project scope is to renovate/restore the clock tower as indicated on the Drawings and Specifications and includes, but not limited to, provide temporary exterior access to the roof and temporary protection of existing roof areas, remove, store, clean and reinstall existing copper weathervane, clean and paint masonry base of clock tower, remove, repair, reinstall and paint existing wood louvers
- Status
- Closed
- Sector
- Metal, Government, Cement, Road, Commercial, Manufacturing (Industrial), Residential
- Location
- Denton, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Caroline County Courthouse Clocktower Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope is to renovate/restore the clock tower as indicated on the Drawings and Specifications and includes, but not limited to, provide temporary exterior access to the roof and temporary protection of existing roof areas, remove, store, clean and reinstall existing copper weathervane, clean and paint masonry base of clock tower, remove, repair, reinstall and paint existing wood louvers (8), remove and replace existing clock tower roof tile, membrane, flashing and wood sheathing, r... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | Denton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Cement, Road, Commercial, Manufacturing (Industrial), Residential |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
