Carpenter Hall Phase 3
Closed · New York · Last reported Mar 2025
Source: Dodge
- The project includes a partial interior and exterior renovation of Carpenter Hall, first floor and basement, including but not limited to: 2. Provide temporary partitions at work areas. Maintain proper egress at all times. 3. Demolish, remove, or salvage select existing construction. 4. Demolish existing multi-story metal stack shelving system, including but not limited too structural posts, in
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Metal, Education
- Location
- Ithaca, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Carpenter Hall Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. The project includes a partial interior and exterior renovation of Carpenter Hall, first floor and basement, including but not limited to: 2. Provide temporary partitions at work areas. Maintain proper egress at all times. 3. Demolish, remove, or salvage select existing construction. 4. Demolish existing multi-story metal stack shelving system, including but not limited too structural posts, integral floor construction and finishes, and associated mechanical and electrical systems. 5. Demo... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Ithaca |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Metal, Education |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
