Carpinteria Advanced Purification Project (CAPP)
One of 10,000+ projects Taiyo tracks in California.
Source: Smart Water Magazine
The Carpinteria Advanced Purification Project (CAPP) is a water reuse scheme that captures fully treated wastewater currently discharged to the Pacific Ocean and purifies it through a multi-step process before injecting it into the local groundwater basin. The system will deliver approximately 1,000 acre feet per year into storage, meeting more than 25% of the community's annual water demand with
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- Carpinteria, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Smart Water Magazine
ConstructChat
Ask ConstructChat about Carpinteria Advanced Purification Project (CAPP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Carpinteria Advanced Purification Project (CAPP) is a water reuse scheme that captures fully treated wastewater currently discharged to the Pacific Ocean and purifies it through a multi-step process before injecting it into the local groundwater basin. The system will deliver approximately 1,000 acre feet per year into storage, meeting more than 25% of the community's annual water demand with a drought-resistant supply. The infrastructure includes an Advanced Water Purification Facility, a 10-inch diameter pipeline, two groundwater injection wells, and two monitoring well clusters. |
Original sector | Water Treatment |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Carpinteria |
Source
Source | Smart Water Magazine |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-04-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in USA
- Replacement of Badger Turbo Meters
- Golf Maintenance Building - Water Heater
- Replaced a 2" domestic water line
- Chill Water Pump Issue
- Pilot Program to Increase Water Supply
- Polk ParkwaySR 570 Bridge Painting Project in Polk County
- SR A1A/Collins Ave from 44 St to 4700 blk and Indian Creek from 41 St to 44 St and SR 112/W 41 St over the Indian Creek Waterway bridge
- Replace 3" domestic water meter located in mechanical room 088
