logo
ProjectPlanning Schematics

Carport Solar Array

Planning schematics · Minnesota · Last reported Aug 2024

Source: Dodge USA

solar area 3900 sqft flat area

Status
Prospective
Sector
Solar, Power Generation (CCGT), Mass Transit, Consumer Products, Rail, Commercial, Residential
Location
Dundas, Minnesota, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Carport Solar Array

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Carport Solar Array” is an infrastructure initiative in the Solar sector, located in Dundas, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

solar area 3900 sqft flat area

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Dundas

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Mass Transit, Consumer Products, Rail, Commercial, Residential

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project