Carriger Solar Project
Sector: Road • Location: Goldendale, Washington, United States
Source: The Lewiston Tribune
The Carriger Solar project is a proposed solar farm in south-central Washington with 160 megawatts of solar generating potential and a 63 megawatt battery energy storage system. It will occupy 1,326 acres within a 2,108-acre development site mostly consisting of agricultural and rural residential lands. The project will tie into the Bonneville Power Administration transmission system and is design
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Carriger Solar project is a proposed solar farm in south-central Washington with 160 megawatts of solar generating potential and a 63 megawatt battery energy storage system. It will occupy 1,326 acres within a 2,108-acre development site mostly consisting of agricultural and rural residential lands. The project will tie into the Bonneville Power Administration transmission system and is designed to power up to 32,500 homes. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States
- Engineering, Procurement, and Construction of Third Bosphorus Bridge
- Morphotek’s New Biologics Production Facility
- LabCentral 238, Cambridge, Massachusetts, USA
- Kite Pharma’s Viral Vector Manufacturing Facility, California, US
- Eli Lilly’s Parenteral Product and Device Manufacturing Facility, Concord, North Carolina
- Amgen’s Drug Substance Manufacturing Plant, Wake County, North Carolina
- Vertex Pharmaceuticals’ Boston Campus
- Roche Diagnostics PCR Diagnostic Kits
