logo

Carrollton Water System Upgrades

Sector: Water Supply and Storage • Location: Carrollton, Alabama, United States of America

Source: Dodge

Project
Closed

Work of the Project includes the removal and replacement of existing 2 , 6 , and 8 gate valves, the removal and replacement of 2 tapping valves and sleeves, and the removal and replacement of 1 and 2 water meters within the Town of Carrollton s drinking water distribution system. The Project work also includes the installation of new 2 , 6 , and 8 gate valves, the installation of new 6 and 8 inser

Status
Closed
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Carrollton, Alabama, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Carrollton Water System Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Carrollton Water System Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Carrollton, Alabama, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work of the Project includes the removal and replacement of existing 2 , 6 , and 8 gate valves, the removal and replacement of 2 tapping valves and sleeves, and the removal and replacement of 1 and 2 water meters within the Town of Carrollton s drinking water distribution system. The Project work also includes the installation of new 2 , 6 , and 8 gate valves, the installation of new 6 and 8 insertion valves, the installation of new 6 fire hydrant gate valves, the installation of new fire hyd...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Alabama

City

Carrollton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project