Cart Path Resurfacing at Dinaland Golf Course
One of 10,000+ projects Taiyo tracks in Utah.
Source: Dodge USA
Cart Path Resurfacing at Dinaland Golf Course Mill and remove 2 inches of the existing cart path surface. Apply a 2-inch asphalt overlay on the cart paths. Ensure proper grading and drainage for the resurfaced paths. Total length of cart paths to be resurfaced: 5 miles (8 feet width). With less than 0.10 new cart path.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Road, Waste Processing and Treatment
- Location
- Vernal, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cart Path Resurfacing at Dinaland Golf Course
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Cart Path Resurfacing at Dinaland Golf Course Mill and remove 2 inches of the existing cart path surface. Apply a 2-inch asphalt overlay on the cart paths. Ensure proper grading and drainage for the resurfaced paths. Total length of cart paths to be resurfaced: 5 miles (8 feet width). With less than 0.10 new cart path. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Vernal |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Road, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
