Carter Barron Amphitheater Power Emergency Repair MATOC
One of 10,000+ projects Taiyo tracks in District of Columbia.
Source: Dodge
The goal of this project is to restore electrical power to CABA Box Office and its parking/perimeter lights. This is to deter criminal activity, provide safe passage to visitors who actively use the walkways and lot near the box office, and to facilitate NPS activities that still operate out of the box office. Without a permanent lighting solution, this area is extremely dark and poses a severe sa
- Status
- Closed
- Sector
- Power Transmission, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive
- Location
- Washington, District of Columbia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Carter Barron Amphitheater Power Emergency Repair MATOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The goal of this project is to restore electrical power to CABA Box Office and its parking/perimeter lights. This is to deter criminal activity, provide safe passage to visitors who actively use the walkways and lot near the box office, and to facilitate NPS activities that still operate out of the box office. Without a permanent lighting solution, this area is extremely dark and poses a severe safety hazard, as it is in high crime area. The work shall include but is not limited to the follow... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | District of Columbia |
City | Washington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
