logo

Carter Barron Amphitheater Power Emergency Repair MATOC

One of 10,000+ projects Taiyo tracks in District of Columbia.

Source: Dodge

Project
Closed

The goal of this project is to restore electrical power to CABA Box Office and its parking/perimeter lights. This is to deter criminal activity, provide safe passage to visitors who actively use the walkways and lot near the box office, and to facilitate NPS activities that still operate out of the box office. Without a permanent lighting solution, this area is extremely dark and poses a severe sa

Status
Closed
Sector
Power Transmission, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive
Location
Washington, District of Columbia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Carter Barron Amphitheater Power Emergency Repair MATOC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Carter Barron Amphitheater Power Emergency Repair MATOC” is an infrastructure initiative in the Power Transmission sector, located in Washington, District of Columbia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The goal of this project is to restore electrical power to CABA Box Office and its parking/perimeter lights. This is to deter criminal activity, provide safe passage to visitors who actively use the walkways and lot near the box office, and to facilitate NPS activities that still operate out of the box office. Without a permanent lighting solution, this area is extremely dark and poses a severe safety hazard, as it is in high crime area. The work shall include but is not limited to the follow...

Procurement method

Budget

Location

Country

United States of America (USA)

State

District of Columbia

City

Washington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Residential, Commercial, Car parking, Automotive

Article published date

2025-08-11

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project