Carter Creek Parkway Reconstruction Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project includes the complete reconstruction of Carter Creek Parkway from E. 29th Street to Villa Maria as a 37 foot wide minor collector roadway with sidewalks and bike lanes. Water and Sanitary Sewer utility replacement should be included with the project and there is a portion of the sanitary sewer that runs under the roadway pavement. This roadway has residential homes fronting onto it bu
- Status
- Prospective
- Sector
- Road, Government, Commercial, Power Transmission, Power Generation (CCGT), Residential, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive
- Location
- Bryan, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Carter Creek Parkway Reconstruction Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This project includes the complete reconstruction of Carter Creek Parkway from E. 29th Street to Villa Maria as a 37 foot wide minor collector roadway with sidewalks and bike lanes. Water and Sanitary Sewer utility replacement should be included with the project and there is a portion of the sanitary sewer that runs under the roadway pavement. This roadway has residential homes fronting onto it but it serves as a minor collector roadway providing good connectivity between southeast and north ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Bryan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial, Power Transmission, Power Generation (CCGT), Residential, Waste Processing and Treatment, Water Supply and Storage, Car parking, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
