Carter Creek Wastewater Treatment Plant Equipment Building
Sector: Automotive • Location: College Station, Texas, United States of America
Source: Dodge USA
This project includes the construction of a 3-sided pre-engineered metal building with an adjacent enclosed vehicle wash rack with drainage system at the Carter Creek Wastewater Treatment Plant located at 2200 N. Forest Pkwy.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project includes the construction of a 3-sided pre-engineered metal building with an adjacent enclosed vehicle wash rack with drainage system at the Carter Creek Wastewater Treatment Plant located at 2200 N. Forest Pkwy. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
