Carters Bridge Drainage Improvements
Closed · Georgia · Last reported Aug 2025
Source: Dodge
The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Replace existing storm pipes with (4) 48 RCP. This will include the construction of headwalls, wingwalls, new foundations, toe walls, concrete aprons, placement of rip-rap, and repair and rebuild on Carters Bridge Road
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Bridge, Commercial, Raw Materials
- Location
- Claxton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Carters Bridge Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist of furnishing all products and equipment and performing all labor necessary to perform the following: Replace existing storm pipes with (4) 48 RCP. This will include the construction of headwalls, wingwalls, new foundations, toe walls, concrete aprons, placement of rip-rap, and repair and rebuild on Carters Bridge Road |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Claxton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Waste Processing and Treatment, Bridge, Commercial, Raw Materials |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
