logo
ProjectClosed

Casa 350 / BLOCO Arquitetos

Sector: Steel

Source: ArchDaily

While all the floors on the ground floor were built with cast-in-place concrete, the floor slabs of the 1st floor and the roof are of the "steel deck" type. All internal walls are of the "dry-wall" type, while all external perimeter walls of the house were executed in common masonry. The blind walls that do not have protective eaves received cladding of composite aluminum panels, as well as their

Status
Closed
Sector
Steel, Cement, Metal, Residential, Commercial, Automotive
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Casa 350 / BLOCO Arquitetos

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Casa 350 / BLOCO Arquitetos” is an infrastructure initiative in the Steel sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

While all the floors on the ground floor were built with cast-in-place concrete, the floor slabs of the 1st floor and the roof are of the "steel deck" type. All internal walls are of the "dry-wall" type, while all external perimeter walls of the house were executed in common masonry. The blind walls that do not have protective eaves received cladding of composite aluminum panels, as well as their external ceilings. The rest of the external walls have plaster and paint finish.Two sections with 7-meter cantilevers at each end of the upper floor create covered areas on the ground floor that serve as extensions of the balconies, social area, and/or car shelter. Motorized, retractable, and translucent awnings were positioned in all open spans. They allow control of natural light entry and adjustment of desired privacy.The house program was organized in a two-volume plan overlaid perpendicularly with a regular grid of 350x350cm in metal structure (hence the name of the house), with the pillars on the perimeter of the internal spaces and around its vertical circulation. The social and service area is located on the ground floor volume, with its two longer sides facing north and south, where the pool is. Meanwhile, the upper volume houses the bedrooms, with all its openings facing the rising sun.Text description provided by the architects.The project started from the demand for a house that could be built in the shortest possible time. All its modularity, finishing options and choice of structural materials are based on this premise. The option for the use of metal structure was therefore due to the available budget, the availability of raw materials in the market at the time of the project and the speed of assembly of the structure. On the other hand, other secondary items of the work, such as wooden ceilings and ground floors, were assembled and/or built by local labor. Thus, the Casa 350 project combines a predominantly prefabricated construction with small sections built in an artisanal way.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Steel, Cement, Metal, Residential, Commercial, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project