logo

Casa Arca / Gonzalo Iturriaga Atala

Sector: Cement

Source: ArchDaily

Project
Closed

A concrete volume as the first floor articulates the public rooms from a sequence of spaces, mediated by a rigid core of vertical circulation and services.From the operation of inserting voids and specific openings on the perimeter, a constant spatial relationship is established between the interior space and the surroundings.A second level, determined as a wooden box, organizes the restrooms. Con

Project Information FAQ

Project Information

3 Q
The project “Casa Arca / Gonzalo Iturriaga Atala” is an infrastructure initiative in the Cement sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A concrete volume as the first floor articulates the public rooms from a sequence of spaces, mediated by a rigid core of vertical circulation and services.From the operation of inserting voids and specific openings on the perimeter, a constant spatial relationship is established between the interior space and the surroundings.A second level, determined as a wooden box, organizes the restrooms. Configured from 3 areas. The first of public order mediates between the vertical connection void, the courtyard, and the projection to the city. The other two bedrooms seek to be a wooden box with specific views of the ravine.Text description provided by the architects.The Proposal is presented as the spatial and programmatic restructuring of the first dwelling developed by the IAA Gonzalo Iturriaga Arquitectos office. 8 years after the execution of this dwelling, the change of owners and, as a result, new spatial, material, and order approaches were part of the requirements delivered for the development of the project.Part of the design exercise was based on establishing new openings and sound relationships with the ravine on the north facade of the project. The cutting and sectioning of concrete elements, the restructuring of the upper box, and the programmatic reorganization were key in the final definition of the proposal.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data