Casa Interstici / NØRA studio
Sector: Steel
Source: ArchDaily
The visual continuity throughout the project is achieved by intermediates floors that house areas of distribution and service, serving as observation points to appreciate the interaction of heights. These new floors seek to establish a material link with the renewed outer volume, creating notable views of the roof, the skylight and the variety of materials used.Text description provided by the arc
- Status
- Closed
- Sector
- Steel, Seaport, Road, Residential, Metal, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Casa Interstici / NØRA studio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The visual continuity throughout the project is achieved by intermediates floors that house areas of distribution and service, serving as observation points to appreciate the interaction of heights. These new floors seek to establish a material link with the renewed outer volume, creating notable views of the roof, the skylight and the variety of materials used.Text description provided by the architects.Located on the same street of the church of Muro, Mallorca, a three-story house with a marès façade emerges that, overall, present great potential. The interior is characterized by a neutral palette of colors, predominantly beige, brown and orange, which gain life when sunlight highlights the stone of the walls and wood of the floors.Upon entering the house, a service module creates a circulation connecting the studio and main hall, both featuring double-high games. In the living room, our eyes are attracted to the highest point, where natural light inundates space. Here, the double height of the living room expands, connecting with different levels across the stairs, revealing hidden spaces between the openings.The main volume of the structure rises as the centerpiece of the project, orchestrating a rehabilitation process that encompasses three fundamental actions: emptying, filling and completing. The interaction between materials plays a crucial role in this work, where sandstone, the local stone, and steel, an inseparable material from the customer's life, form a relationship of contrasts of lights, textures and tones, merging the new with the old.On the back facade, where previously there was simply a small room attached to the volume, now lies both the main suite and the kitchen and dinning room. This new volume is distinguished from the preexisting structure, using the staircase as a separation element and creating a sense of elevation. The continuity of the floor both inside and outside clears the boundaries between the spaces, emphasizing the presence of the upper volume. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Seaport, Road, Residential, Metal, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- Fire Lake Mining
- Kearl Ore Preparation Plant
