logo

Casa PJA / ES-arch

Sector: Road

Source: ArchDaily

Project
Closed

To the south, the facade is demolished and the volume is lengthened accordingly according to the geometries of the existing. This part is also made of lime plaster. The intention of the project is to make the new parts in lime plaster; in this way, the different nature of the plaster of the added bodies determines a comparison between the new and the old. Thus emerges the process of forming the pr

Project Information FAQ

Project Information

3 Q
The project “Casa PJA / ES-arch” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

To the south, the facade is demolished and the volume is lengthened accordingly according to the geometries of the existing. This part is also made of lime plaster. The intention of the project is to make the new parts in lime plaster; in this way, the different nature of the plaster of the added bodies determines a comparison between the new and the old. Thus emerges the process of forming the project artifact.The east side, facing the public street, is configured as a mute elevation (except for a small window and the entrance door); while the east side, not visible from the public street, opens to the landscape. The exterior arrangements result from the need to clear the west front on its ground floor; a small ground movement, related to the existing slope, allows for a small shelf. To the south, the existing system is repurposed; a small wall and access stair delimits the outdoor use space. In conclusion, the project building uses traditional materials (lime plaster) to narrate a process of transformation, adapting the building for residential use, while respecting the dominant landscape.Its south facade echoes the classical facade composition of rural buildings with a French door and square windows. The connection between the main building and the one on the site of the first parcel is recessed into the ground and contained in height. It has two types of facade. To the west, a glazed surface reflects the landscape and ideally leads back to the separation of the two bodies; to the east, the plastered wall is supported by two pools at different heights, in which some raspberry plants will be housed. In this way, the "full" connection will reconfigure the original solution of the long body.Text description provided by the architects.The project intends to make evident the process of transformation of the building: from a building for rural use to a seasonal residence. Since changes are configured from the volumetric point of view, the intention is to make obvious any "added" elements. The building on the site of the first parcel of land is reconstructed into a single-story in lime plaster. It is to maintain the airtight character of the original building; for this reason, it is distinguished through a single opening set back from the outer edge of the wall. This choice allows for a "void" marked by a deep shadow, as is often the case with rural buildings, and not a reflection of glazed elements.The project consists of two floors: on the ground floor, there is a sleeping area consisting of a room, a service bathroom, and a multi-purpose room to the south. Through a straight staircase,e there is access to the living floor located above. It consists of a single space in which the kitchenette is located. Through a small glazed corridor,r one has access to the study. The living area, like the room on the ground floor, is distinguished through a large window placed to the west.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data