logo

Casella Waste Systems Connecticut MRF Upgrade

Sector: Waste Processing and Treatment • Location: Willimantic, Connecticut, United States

Source: Recycling Product News

Project
Completed

Casella Waste Systems renovated its Willimantic, Connecticut materials recovery facility (MRF) with new equipment from Machinex to double its processing capacity to 120,000 tons annually. The upgrade includes a new sorting system, power infrastructure, lighting, replacement tipping floor, new pavement, and enhanced fire suppression system. Casella partnered with Eversource to improve electrical ef

Status
Closed
Sector
Waste Processing and Treatment, Power Generation (CCGT), Road
Location
Willimantic, Connecticut, United States of America
Updated
22 Jul 2026
Source
Recycling Product News

ConstructChat

Ask ConstructChat about Casella Waste Systems Connecticut MRF Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Casella Waste Systems Connecticut MRF Upgrade” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Willimantic, Connecticut, United States. Taiyo aggregates data on it from Recycling Product News.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Casella Waste Systems renovated its Willimantic, Connecticut materials recovery facility (MRF) with new equipment from Machinex to double its processing capacity to 120,000 tons annually. The upgrade includes a new sorting system, power infrastructure, lighting, replacement tipping floor, new pavement, and enhanced fire suppression system. Casella partnered with Eversource to improve electrical efficiency and reduce energy usage. The investment in the facility is nearly $20 million.

Original sector

Waste Management

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Willimantic

Source

Source

Recycling Product News

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Power Generation (CCGT), Road

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project