Caspian Seabed Power Cable Project
Sector: Power Generation (CCGT) • Location: Turkmenbashi, Turkmenistan
Source: Report.az
A project to lay an energy cable along the bottom of the Caspian Sea for electricity export, potentially connecting Turkmenistan and Azerbaijan, with further export possibilities to other countries. Turkmenistan is also constructing a combined cycle power plant in Turkmenbashi with a capacity of 1,574 megawatts to serve as a key generation source for export.
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Turkmenbashi, Turkmenistan
- Updated
- 22 Jul 2026
- Source
- Report.az
ConstructChat
Ask ConstructChat about Caspian Seabed Power Cable Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A project to lay an energy cable along the bottom of the Caspian Sea for electricity export, potentially connecting Turkmenistan and Azerbaijan, with further export possibilities to other countries. Turkmenistan is also constructing a combined cycle power plant in Turkmenbashi with a capacity of 1,574 megawatts to serve as a key generation source for export. |
Original sector | Energy |
Location
Country | Turkmenistan |
City | Turkmenbashi |
Source
Source | Report.az |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
