logo

Castilblanco Viaduct

Sector: Automotive • Location: Extremadura, Spain

Source: Ferrovial

Project
Close

Ferrovial Business Lines Projects Castilblanco Viaduct Badajoz, Spain video €8.26 M Adjudication Budget 437.50 m Length 10 Spans The Castilblanco viaduct in Badajoz is located on the N-502 highway over the Guadiana River. It facilitates travel by connecting the two banks of the García Sola Dam. The emergency construction was done in record time in order to cover the needs of the citizens and to

Project Information FAQ

Project Information

5 Q
The project “Castilblanco Viaduct” is an infrastructure initiative in the Automotive sector, located in Extremadura, Spain. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects Castilblanco Viaduct Badajoz, Spain video €8.26 M Adjudication Budget 437.50 m Length 10 Spans The Castilblanco viaduct in Badajoz is located on the N-502 highway over the Guadiana River. It facilitates travel by connecting the two banks of the García Sola Dam. The emergency construction was done in record time in order to cover the needs of the citizens and to guarantee their safety. The existing viaduct was built in the 1960s and showed some signs of damage that needed replacing. As a result, it was limited to a maximum load of 3,500 kg by the Demarcación de Carreteras del Estado in Extremadura since the month of May 2015, stopping the flow of all heavy vehicles, even firemen, school buses, etc. The alternate route for these vehicles was about 100 km longer. The structure built for the Ministry of Public Works and Transit replaced the previous one, and it consisted in building a new viaduct parallel to the existent one, which has remained out of service, with a small change to the N-502's route to include the new bridge. Viaduct characteristics and specifications It is made up of 10 spans 43.75 meters long each, adding up to a total of 437.50 meters between abutments. The platform is made up of just one two-lane roadway 3.50 meters wide: one lane in each direction of traffic, and both lateral shoulders 1.50 meters wide. The deck is supported by prestressed, prefabricated box girder beams with 43.75-meter spans put into place by a launcher. Each span consists of two simply supported beams and makes up statically determinate spans 2.20 meters wide and 5 meters from the inter-axis in the direction perpendicular to the viaduct, a layer of compression 30 cm thick, making the total width of the deck 11.50 meters. The intermediate supports are made by means of a prismatic lintel measuring 11.50 x 3.00 x 1.80 m that serves as bracing for the two pilot pilons 1.80 m in diameter that are embedded in the rocky ground below the dam bed. Due to the major loads from the launch car, it was necessary to prestress the joint between the lintel and each of the two pilot pylons.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data