Castle Biosciences Building
Construction · Arizona · Last reported Dec 2024
Source: Dodge USA
Tenant improvement to include the demolition of existing interior partitions and millwork and the construction of new. Provide new constructed partition. Existing ceiling grid to remain. New lighting to be provided throughout. M/P/E to be modified to suit new layout. New millwork and finishes to be provided. Provide structural as required for moveable partitions.
- Status
- Under Construction
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Phoenix, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Castle Biosciences Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tenant improvement to include the demolition of existing interior partitions and millwork and the construction of new. Provide new constructed partition. Existing ceiling grid to remain. New lighting to be provided throughout. M/P/E to be modified to suit new layout. New millwork and finishes to be provided. Provide structural as required for moveable partitions. |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2024-12-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
