Castrovido dam
Sector: Hydro • Location: Spain
Source: FCC Construction
This dam was constructed with the main purpose of regulating flow of the Arlanza River. The strategy included forming a reservoir with storage capacity of 44,000,000 cubic meters and an area of 214 hectares, equivalent to 212 medium sized soccer fields.The infrastructure consists of the main dam, a central hydroelectric dam, tailings dam on site, and the road layouts affected by this work.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This dam was constructed with the main purpose of regulating flow of the Arlanza River. The strategy included forming a reservoir with storage capacity of 44,000,000 cubic meters and an area of 214 hectares, equivalent to 212 medium sized soccer fields.The infrastructure consists of the main dam, a central hydroelectric dam, tailings dam on site, and the road layouts affected by this work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Low |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
