CAT 5.2 Sewer System, Repairs and Lagoon Replacement
Sector: Water Supply and Storage • Location: Pierre, South Dakota, United States of America
Source: Dodge USA
THE SCOPE OF WORK ON THIS PROJECT IS TO REHABILITATE THE EXISTING WASTEWATER LAGOON, REMOVE AND REPLACE SEWER FORCEMAIN AND SEWER VALVE VAULT, REMOVE AND REPLACE SEPTIC TANK AND GRAVITY SEWER LINE, REMOVE AND REPLACE LIFT STATION, AND INSTALL A POTABLE WATER IRRIGATION LINE.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Pierre, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CAT 5.2 Sewer System, Repairs and Lagoon Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | THE SCOPE OF WORK ON THIS PROJECT IS TO REHABILITATE THE EXISTING WASTEWATER LAGOON, REMOVE AND REPLACE SEWER FORCEMAIN AND SEWER VALVE VAULT, REMOVE AND REPLACE SEPTIC TANK AND GRAVITY SEWER LINE, REMOVE AND REPLACE LIFT STATION, AND INSTALL A POTABLE WATER IRRIGATION LINE. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Pierre |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
