Catalina Sea Wall
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The project consists of removing existing timber cribbing and placement of new armour stone protection along the shoreline in the town of Trinity Bay North. The scope of the project includes removal of the existing crib, culvert and placing 3-4 tonne of new armour stone and filler along the shoreline, replacing 1,320 m2 of asphalt and 330m of curb and gutter. The project aims to protect the commun
- Status
- Prospective
- Sector
- Forest Products and Packaging, Road, Government
- Location
- Newfoundland and Labrador, Canada
- Updated
- 19 Nov 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Catalina Sea Wall
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project consists of removing existing timber cribbing and placement of new armour stone protection along the shoreline in the town of Trinity Bay North. The scope of the project includes removal of the existing crib, culvert and placing 3-4 tonne of new armour stone and filler along the shoreline, replacing 1,320 m2 of asphalt and 330m of curb and gutter. The project aims to protect the community and reduce the effects of erosion from a faulty sea wall. |
Original sector | Climate Resilience |
Budget |
Location
Country | Canada |
State | Newfoundland and Labrador |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Road, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in Canada
- Evanston Centre
- Woodfibre LNG Project, British Columbia
- Aga Khan Museum + Ismaili Centre
- 728 Yonge
- Children's and Women's Clinical Support Building
- Thorold Cogeneration Project Ontario Canada
- Surrey Biofuel Processing Facility Project
- Surrey Memorial Hospital Redevelopment and Expansion: Emergency Department and Critical Care Tower
