Cataltepe and Kuyucak Wind Farms
Sector: Commercial • Location: Turkey
Source: World Bank Group
Alize Enerji Elektrik Uretim AS was created to build and operate Cataltepe and Kuyucak Wind Farms in Turkey. Cataltepe Wind Farm was a 16WM consisting of 8 wind turbines onshore in Cataltepe village the province of Balikesir and Kuyucak Wind Farm was 25.6 MW consisting of 14 wind turbines in Kuyucak, Manisa province. Both projects, with a total capacity of 41.6 MW, aimed at selling electricity to
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Alize Enerji Elektrik Uretim AS was created to build and operate Cataltepe and Kuyucak Wind Farms in Turkey. Cataltepe Wind Farm was a 16WM consisting of 8 wind turbines onshore in Cataltepe village the province of Balikesir and Kuyucak Wind Farm was 25.6 MW consisting of 14 wind turbines in Kuyucak, Manisa province. Both projects, with a total capacity of 41.6 MW, aimed at selling electricity to the national grid. All of the turbines were provided by German firm, Enercon. Alize Enerji Elektrik Uretim AS was owned by Demirer Holding (76%) and Bores Bozcaada Rüzgar Enerjisi Santral (23%) which is a subisidiary of Demirer Holding. The project cost was estimated to be €53.263m (US$74.577m). The project reached financial closure in January 2010. Financing comprised €46 debt and €7.263m equity. The debt was split between a €45m 12-year term loan and a €1m 12-year revolving credit facility. The loan agreement was signed with Garanti Bank as the sole lender. Construction works for the two projects began in Dec 2009 and the plants were expected to be operational in Jun 2010. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
