logo

Cataltepe and Kuyucak Wind Farms

Sector: Wind • Location: Turkey

Source: World Bank Group

Project
Active

Alize Enerji Elektrik Uretim AS was created to build and operate Cataltepe and Kuyucak Wind Farms in Turkey. Cataltepe Wind Farm was a 16WM consisting of 8 wind turbines onshore in Cataltepe village the province of Balikesir and Kuyucak Wind Farm was 25.6 MW consisting of 14 wind turbines in Kuyucak, Manisa province. Both projects, with a total capacity of 41.6 MW, aimed at selling electricity to

Status
Prospective
Sector
Wind, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cataltepe and Kuyucak Wind Farms

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cataltepe and Kuyucak Wind Farms” is an infrastructure initiative in the Wind sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Alize Enerji Elektrik Uretim AS was created to build and operate Cataltepe and Kuyucak Wind Farms in Turkey. Cataltepe Wind Farm was a 16WM consisting of 8 wind turbines onshore in Cataltepe village the province of Balikesir and Kuyucak Wind Farm was 25.6 MW consisting of 14 wind turbines in Kuyucak, Manisa province. Both projects, with a total capacity of 41.6 MW, aimed at selling electricity to the national grid. All of the turbines were provided by German firm, Enercon. Alize Enerji Elektrik Uretim AS was owned by Demirer Holding (76%) and Bores Bozcaada Rüzgar Enerjisi Santral (23%) which is a subisidiary of Demirer Holding. The project cost was estimated to be €53.263m (US$74.577m). The project reached financial closure in January 2010. Financing comprised €46 debt and €7.263m equity. The debt was split between a €45m 12-year term loan and a €1m 12-year revolving credit facility. The loan agreement was signed with Garanti Bank as the sole lender. Construction works for the two projects began in Dec 2009 and the plants were expected to be operational in Jun 2010.

Original sector

Energy

Budget

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project