Catalyst Church
Sector: Metal • Location: Bentonville, Arkansas, United States of America
Source: Dodge
Catalyst Church is proposing a new church at 3700 East Central Avenue. The church will have a 500 seat sanctuary and there will not be a school associated with the project. Access to the site will be from the public street, Kenwood Drive
- Status
- Under Construction
- Sector
- Metal, Road, Manufacturing (Industrial), Commercial
- Location
- Bentonville, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Catalyst Church
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Catalyst Church is proposing a new church at 3700 East Central Avenue. The church will have a 500 seat sanctuary and there will not be a school associated with the project. Access to the site will be from the public street, Kenwood Drive |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Bentonville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Road, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
