Cataventos Paracuru I Wind Power Plant

Sector: Commercial • Location: Brazil

Source: World Bank Group

Project
Active

The company Tecneira Acarau Geracao e Comercio de Energia Eletrica S.A., a wholly-owned subsidiary of the Portuguese Group CME ,was granted the authorization to build a wind power plant located in the state of Ceara (30 MW in capacity). The 35-year contract was signed with the regulatory agency ANEEL in March 2012.

The power plant was named EOL Cataventos Paracuru I. The total investment in the

Project Information FAQ

Project Information

5 Q
The project “Cataventos Paracuru I Wind Power Plant” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The company Tecneira Acarau Geracao e Comercio de Energia Eletrica S.A., a wholly-owned subsidiary of the Portuguese Group CME ,was granted the authorization to build a wind power plant located in the state of Ceara (30 MW in capacity). The 35-year contract was signed with the regulatory agency ANEEL in March 2012. The power plant was named EOL Cataventos Paracuru I. The total investment in the power plant was estimated at US$ 46.4 million (BRL 109 million) and was financed with a loan granted by the state-owned development bank BNDES approved in February 2014 (US$ 34.5 million or BRL 81 million). The government periodically runs public bidding for the sale of energy to the country´s distribution companies. The power plant EOL Cataventos Paracuru I won the public bidding that took place in 2011, by offering an average tariff of US$ 63.1/MWh (BRL 103/MWh). The project company signed 20-year power purchase agreements with the several electricity distribution companies and committed to start supplying to the market in 2014. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. Construction works commenced in June 2013 and were still underway as of December 2014.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data