logo

Catch Basin Repairs

Sector: Water Supply and Storage • Location: Irmo, South Carolina, United States of America

Source: Dodge USA

Project
Bidding

The contractor shall excavate five (5) storm water drop inlets and one (1) storm drain pipe to determine the cause of settling and erosion at the following schools: a. Spring Hill High School- 3 storm water catch basins b. Chapin High School- 2 storm water drain pipe junctions and 1 storm drain pipe 2. The contractor shall provide all labor, equipment, transportation, materials and supplies necess

Status
Prospective
Sector
Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
Location
Irmo, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Catch Basin Repairs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Catch Basin Repairs” is an infrastructure initiative in the Water Supply and Storage sector, located in Irmo, South Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The contractor shall excavate five (5) storm water drop inlets and one (1) storm drain pipe to determine the cause of settling and erosion at the following schools: a. Spring Hill High School- 3 storm water catch basins b. Chapin High School- 2 storm water drain pipe junctions and 1 storm drain pipe 2. The contractor shall provide all labor, equipment, transportation, materials and supplies necessary to perform the work. 3. The contractor will provide owner with photos of each inlet box and p...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Irmo

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Waste Processing and Treatment

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project