CATEG Management Contract
Sector: Power Generation (CCGT) • Location: Ecuador
Source: World Bank Group
In November 2006, Electricidad de Valencia (Eleval) signed a five year management contract to operate CATEG, Ecuador’s power generation and distribution company for southern Guayaquil. The terms of the contract allowed for a one-time five-year extension.
In 2006, CATEG had a generation capacity of 213 MW and approximately 400,000 connections in its distribution network. Eleval outbid the Colom
- Status
- Closed
- Sector
- Power Generation (CCGT), Power Transmission, Government
- Location
- Ecuador
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about CATEG Management Contract
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In November 2006, Electricidad de Valencia (Eleval) signed a five year management contract to operate CATEG, Ecuador’s power generation and distribution company for southern Guayaquil. The terms of the contract allowed for a one-time five-year extension. In 2006, CATEG had a generation capacity of 213 MW and approximately 400,000 connections in its distribution network. Eleval outbid the Colombian multi-utility EPM and US firm Southern Light & Gas Company. Eleval was to receive approximately US $4.4 million (2.2%) of Categ’s estimated US $180 million turnover per year for their services. Eleval’s consortium was comprised of its subsidiaries Electricidad de Valancia Capital and Valencia Electricity Corp. As of January 2007, Conelec, Ecuador’s electricity regulator, appointed a temporary administrator of CATEG and had not ceded control of CATEG to Eleval. The administration of President Alfredo Palacio signed the contract with Eleval in 2006, but the new administration of President Correa challenged its validity in 2007 and considered terminating the contract. In July 2007, President Correa signed a decree creating Guayaquil electric power unit Udelec, a state owned enterprise that replaces Categ, the "temporary administrator" of Guayaquil-based generator and distributor. |
Original sector | Energy |
Location
Country | Ecuador |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Government |
Article published date | 2024-06-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
