logo
ProjectBidding

Cats-M 88m Utilities Extension

Bidding · Nebraska · Last reported Aug 2024

Source: Dodge USA

The project consists of furnishing all construction services, labor, equipment, tools, materials, travel, lifts, licenses and permits required to improve (extend) the utility lines north up to the 88 M course training area from existing end points near and along J Street at the Mead Training Site, Yutan, Nebraska. Project to include extension of underground potable waterlines, underground electric

Status
Prospective
Sector
Power Transmission, Rail, Water Supply and Storage, Road, Power Generation (CCGT), Commercial
Location
Yutan, Nebraska, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cats-M 88m Utilities Extension

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cats-M 88m Utilities Extension” is an infrastructure initiative in the Power Transmission sector, located in Yutan, Nebraska, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of furnishing all construction services, labor, equipment, tools, materials, travel, lifts, licenses and permits required to improve (extend) the utility lines north up to the 88 M course training area from existing end points near and along J Street at the Mead Training Site, Yutan, Nebraska. Project to include extension of underground potable waterlines, underground electrical conduit and conductors, communication conduit and fiber lines, and supporting end point servic...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nebraska

City

Yutan

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Transmission, Rail, Water Supply and Storage, Road, Power Generation (CCGT), Commercial

Article published date

2024-08-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project