Cats-M 88m Utilities Extension
Sector: Water Supply and Storage • Location: Yutan, Nebraska, United States of America
Source: Dodge USA
The project consists of furnishing all construction services, labor, equipment, tools, materials, travel, lifts, licenses and permits required to improve (extend) the utility lines north up to the 88 M course training area from existing end points near and along J Street at the Mead Training Site, Yutan, Nebraska. Project to include extension of underground potable waterlines, underground electric
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Power Generation (CCGT), Commercial, Power Transmission, Rail
- Location
- Yutan, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Cats-M 88m Utilities Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of furnishing all construction services, labor, equipment, tools, materials, travel, lifts, licenses and permits required to improve (extend) the utility lines north up to the 88 M course training area from existing end points near and along J Street at the Mead Training Site, Yutan, Nebraska. Project to include extension of underground potable waterlines, underground electrical conduit and conductors, communication conduit and fiber lines, and supporting end point servic... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Yutan |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Power Generation (CCGT), Commercial, Power Transmission, Rail |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
