Catskill–Delaware Ultraviolet Water Treatment Facility, New York

Source: Water Technology

Project
Closed

Aerial view of the Catskill-Delaware project site during the construction phase. Architectural rendering of the world's biggest UV treatment facility. The treatment plant has the capacity to treat 2.24 billion gallons a day (BGD) of water. The project witnessed the installation of 10,000ft of stainless steel pipes. Unit three of the Delaware / Catskill UV Treatment Facility. The treatment plant fe

Project Information FAQ

Project Information

5 Q
The project "Catskill–Delaware Ultraviolet Water Treatment Facility, New York" is an infrastructure initiative in the Advanced Electronics, Cement, Commercial, Power Generation (CCGT), Steel, Tunnel, Water Supply and Storage, Waste Processing and Treatment, Metal sector, located in N/A, Thailand. Taiyo aggregates data from Water Technology, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Aerial view of the Catskill-Delaware project site during the construction phase. Architectural rendering of the world's biggest UV treatment facility. The treatment plant has the capacity to treat 2.24 billion gallons a day (BGD) of water. The project witnessed the installation of 10,000ft of stainless steel pipes. Unit three of the Delaware / Catskill UV Treatment Facility. The treatment plant features four 144in x 120in venturi flow meters. Delaware / Catskill UV Treatment facility came online in October 2013. Catskill-Delaware Ultraviolet Water Treatment Facility, which came online in October 2013, is the biggest ultraviolet (UV) disinfection facility in the world. It is located downstream of Kensico Reservoir within the towns of Mount Pleasant and Greenburgh in Westchester County. It has a water treatment capacity of 2.24 billion gallons a day (BGD). The New York City Department of Environmental Protection owns the plant. Planning activities for the project commenced in 2002, construction commenced in 2006 and the initial treatment activity began in 2012. Total construction cost reached $1.5bn. The facility serves more than nine million people in New York and created approximately 740 construction jobs and 40 permanent jobs. The project won the 2013 Best New York Region Project Award, from Engineering News-Record (ENR), in the water / environment category. It also won the UV Engineering Project of the Year Award from International Ultraviolet Association (IUVA) in October 2013. The new UV water treatment project is a result of the precautionary measures adopted by the City of New York following the outbreaks of Cryptosporidium and Giardia-related illnesses in other parts of the US. It was also constructed to meet the requirements of the Environmental Protection Agency’s (EPA) Long Term 2 Enhanced Surface Water Treatment Rule in Westchester County. A filtration plant estimated at $8bn was proposed initially, but the plan was later changed to building a UV facility, resulting in substantial savings. The design of the treatment plant provides an option for a two billion gallon-per-day filtration plant to be built on the same site in future. The Catskill and Delaware watersheds supply 90% of the city’s drinking water. The two watersheds, along with the Croton watershed, extend for more than 200km, incorporating 19 reservoirs and three controlled lakes. The water disinfection facility covers approximately 160,000 square feet. The above-ground portion of the building is constructed of structural steel with a precast facade, while the roof of the main building is constructed of stainless-steel. Security measures that went into the plant’s design included electronic access and monitoring systems, gate and fence systems to create stand-off areas and creating a blast resistant structure. The construction works involved 1.3 million square feet of foundation works, installation of 10,000ft of stainless steel pipe, more than a mile of field-cement-lined 12ft-diameter pipes, 1,200t of structural steel, 20,000 square feet of aluminium grating and pouring of 121,000 cubic yards of concrete. Electricity is supplied to the plant via two 13,000V feeder lines incorporating backup generation system. The project also included improvements to the existing Delaware Aqueduct. The plant applies low-pressure, high-output (LPHO) UV disinfection technology, which requires 30% less power than the alternative, medium-pressure lamps. It features 56 TrojanUVTorrent units consisting of stainless steel disinfection chambers featuring 11,760 UV lamps immersed in the water flow. Each unit is capable of processing 40 million gallons of water. The UV vessels measure 48 inches in diameter. Other treatment equipment includes four 12ft diameter raw water pipes and four 144in x 120in venturi flow meters. The facility also integrates 16 84-in-diameter energy dissipation valves to control flow throughout the plant. The treatment process involves screening, UV treatment and chlorination. The treated water is conveyed to the existing Delaware Catskill aqueducts through gravity before being supplied to the consumers. The plant was constructed by a joint venture (JV) of Skanska USA Civil, ECCO III and JF White. CH2M HILL, in partnership with Arcadis, was the construction manager. The planning, design and construction services were provided by a joint venture comprising of CDM Smith and Hazen and Sawyer. Dattner Architects provided the plant design, while the electrical works were carried out by Welsback Electric and the plumbing & HVAC works by LJ Coppola. Construction of the new Brightwater WWTP, which began with preliminary demolition and clearance work on the 114 acre site in November 2005, was originally scheduled to enter service in 2010. New York’s City Tunnel No. 3 is one of the most complex and intricate engineering projects in the world.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data