logo
ProjectClosed

Cattail Creek Force Main Replacement

Closed · Maryland · Last reported Jul 2024

Source: Dodge USA

The installation of approximately 17,000 linear feet of 24 and 36 HDPE DR 17 linear, replacement of six (6) Air Release Valves and five (5) Blow Off Valves, two (2) odor control units, traffic control, and bypass installation and removal.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
Location
Arnold, Maryland, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Cattail Creek Force Main Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cattail Creek Force Main Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Arnold, Maryland, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The installation of approximately 17,000 linear feet of 24 and 36 HDPE DR 17 linear, replacement of six (6) Air Release Valves and five (5) Blow Off Valves, two (2) odor control units, traffic control, and bypass installation and removal.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maryland

City

Arnold

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Government, Commercial

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project