logo

Catxere Transmissora de Energia

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

In November 2009, the Spanish company Cymi Holding S.A., a subsidiary of ACS, was awarded in a competitive bidding process the contract to build and operate 602-km of transmission lines located in the state of Mato Grosso. Besides Cymi Holding S.A., four other companies took part in the contest, though only two other participated in the final stage of the process: Bimetal Industria Metalurgica Ltd

Status
Prospective
Sector
Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Catxere Transmissora de Energia

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Catxere Transmissora de Energia” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2009, the Spanish company Cymi Holding S.A., a subsidiary of ACS, was awarded in a competitive bidding process the contract to build and operate 602-km of transmission lines located in the state of Mato Grosso. Besides Cymi Holding S.A., four other companies took part in the contest, though only two other participated in the final stage of the process: Bimetal Industria Metalurgica Ltda and Consorcio Integracao Norte Brasil (state-owned Eletronorte, 24.5%; state-owned Eletrosul, 24.5%; Spanish company Abengoa, 25.5%; and the Brazilian company Andrade Gutierrez, 25.5%). The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Cymi Holding S.A. presented the lowest offer, a value of US$ 17.5 million (BRL 35 million), 15% below the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsors created the company Catxere Transmissora de Energia to lead the project during the 30-year contract period. The sponsor committed to invest US$ 180.25 million (BRL 360.5 million) in the transmission line. The construction works commenced in October 2009. In January 2010, the sponsor was granted a US$ 36 million (BRL 63.5 million) loan from BNDES. In August 2011, BNDES granted an additional US$ 118.3 million (BRL 193 million) loan to finance infrastructure works in the project. Construction works were concluded in February 2012. In October 2012, the Chinese company State Grid acquired two transmission line projects that belonged to Cymi Holdings.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project