In November 2009, the Spanish company Cymi Holding S.A., a subsidiary of ACS, was awarded in a competitive bidding process the contract to build and operate 602-km of transmission lines located in the state of Mato Grosso. Besides Cymi Holding S.A., four other companies took part in the contest, though only two other participated in the final stage of the process: Bimetal Industria Metalurgica Ltd

Project Information FAQ

Project Information

5 Q
The project “Catxere Transmissora de Energia” is an infrastructure initiative in the Commercial sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2009, the Spanish company Cymi Holding S.A., a subsidiary of ACS, was awarded in a competitive bidding process the contract to build and operate 602-km of transmission lines located in the state of Mato Grosso. Besides Cymi Holding S.A., four other companies took part in the contest, though only two other participated in the final stage of the process: Bimetal Industria Metalurgica Ltda and Consorcio Integracao Norte Brasil (state-owned Eletronorte, 24.5%; state-owned Eletrosul, 24.5%; Spanish company Abengoa, 25.5%; and the Brazilian company Andrade Gutierrez, 25.5%). The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. Cymi Holding S.A. presented the lowest offer, a value of US$ 17.5 million (BRL 35 million), 15% below the ceiling set by the regulatory agency. The contract was signed in February 2009, and the sponsors created the company Catxere Transmissora de Energia to lead the project during the 30-year contract period. The sponsor committed to invest US$ 180.25 million (BRL 360.5 million) in the transmission line. The construction works commenced in October 2009. In January 2010, the sponsor was granted a US$ 36 million (BRL 63.5 million) loan from BNDES. In August 2011, BNDES granted an additional US$ 118.3 million (BRL 193 million) loan to finance infrastructure works in the project. Construction works were concluded in February 2012. In October 2012, the Chinese company State Grid acquired two transmission line projects that belonged to Cymi Holdings.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data