CAVE SPRING TAILWAY SYSTEM
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
The proposed project will include the construction of 2100 linear feet of concrete sidewalk to complete a loop around the park providing pedestrian access throughout. The proposed sidewalk will begin at Rolater Drive, parallel to Cedartown Road, and circle the park, tying onto an existing sidewalk near the site of the entrance to the Cave and the spring outfall. Along with the addition of the sid
- Status
- Closed
- Sector
- Road, Cement, Car parking, Manufacturing (Industrial), Automotive, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CAVE SPRING TAILWAY SYSTEM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will include the construction of 2100 linear feet of concrete sidewalk to complete a loop around the park providing pedestrian access throughout. The proposed sidewalk will begin at Rolater Drive, parallel to Cedartown Road, and circle the park, tying onto an existing sidewalk near the site of the entrance to the Cave and the spring outfall. Along with the addition of the sidewalk, the project will also involve the installation of several rest areas with provisions for seating, a fitness station, landscaping, and trash receptacles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Car parking, Manufacturing (Industrial), Automotive, Government |
Article published date | 2025-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
