CAVE SPRING TAILWAY SYSTEM
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The proposed project will include the construction of 2100 linear feet of concrete sidewalk to complete a loop around the park providing pedestrian access throughout. The proposed sidewalk will begin at Rolater Drive, parallel to Cedartown Road, and circle the park, tying onto an existing sidewalk near the site of the entrance to the Cave and the spring outfall. Along with the addition of the sid
- Status
- Closed
- Sector
- Car parking, Cement, Road, Government, Automotive, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about CAVE SPRING TAILWAY SYSTEM
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project will include the construction of 2100 linear feet of concrete sidewalk to complete a loop around the park providing pedestrian access throughout. The proposed sidewalk will begin at Rolater Drive, parallel to Cedartown Road, and circle the park, tying onto an existing sidewalk near the site of the entrance to the Cave and the spring outfall. Along with the addition of the sidewalk, the project will also involve the installation of several rest areas with provisions for seating, a fitness station, landscaping, and trash receptacles. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Cement, Road, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
