Cavite EPZA Diesel Power Plant

Sector: Commercial • Location: Philippines

Source: World Bank Group

Project
Distressed

This 63-MW plant is located in Rosario, Cavite, in the Cavite Export Processing Zone. A first phase (48 MW) came on-line in 1995. The plant was constructed on a build-own-operate basis. The plant was powered by bunker-C diesel fuel. The second phase, an expansion of 15MW, was expected to be operational by 1998. The electricity was to be sold under a PPA to the Philippine Economic Zone Authority (

Status
Failure
Sector
Commercial, Power Generation (CCGT), Government
Location
Philippines
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cavite EPZA Diesel Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cavite EPZA Diesel Power Plant” is an infrastructure initiative in the Commercial sector, located in Philippines. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Distressed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This 63-MW plant is located in Rosario, Cavite, in the Cavite Export Processing Zone. A first phase (48 MW) came on-line in 1995. The plant was constructed on a build-own-operate basis. The plant was powered by bunker-C diesel fuel. The second phase, an expansion of 15MW, was expected to be operational by 1998. The electricity was to be sold under a PPA to the Philippine Economic Zone Authority (PEZA), for resale to business located within the zone. The PPA with PEZA was vaild until 2009. Excess capacity was to be sold to Napocor. Covanta Energy, formerly known as Ogden Corp., acquired 100% ownership of this project from CMS Generation and Magellan Capital Holdings in February 1999. On January 3, 2002, PEZA, the main off-taker for the project, served the project company with notice of termination of the PPA for alleged non-performance by the project. Due to high fuel pricing and low tariff conditions, project revenues were insufficient to cover both operating costs and debt service beyond the second quarter of 2004 and in May 2004, the Magellan project company filed a petition for corporate rehabilitation under Philippine Law. On October 20, 2005, the Court overseeing the rehabilitation issued an order approving, with certain modifications, a rehabilitation plan. The approved rehabilitation plan, among other things, provided for debt restructuring and reduction via a debt-to-preferred equity swap. Under the plan, Covanta Energy was to retain management control of the project, but its equity interest will be reduced from 100% to approximately 30 to 36%. The court’s order was appealed by certain creditors which could result in modifications to the rehabilitation plan. On March 27, 2006, the Court granted an appeal made by the creditors, thereby anulling the rehabilitation plan.

Original sector

Energy

Budget

Location

Country

Philippines

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Government

Article published date

2024-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project