Cayman Islands solid waste management PPP project
One of 1,498 projects Taiyo tracks in UK (United Kingdom).
Source: InfraPPPWorld
The Integrated Solid Waste Management System (ISWMS) project includes the following system components, with the ultimate aim of reducing the amount of waste going to landfill by up to 95 per cent from current landfill amounts. The ISWMS project also includes costing for the future remediation/closing of the three existing unlined landfills on the islands:Waste reduction measures – including waste
- Status
- Prospective
- Sector
- Residential, Biomass, Waste Processing and Treatment, Water Supply and Storage, Government, Education, Manufacturing (Industrial)
- Location
- United Kingdom
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Cayman Islands solid waste management PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Integrated Solid Waste Management System (ISWMS) project includes the following system components, with the ultimate aim of reducing the amount of waste going to landfill by up to 95 per cent from current landfill amounts. The ISWMS project also includes costing for the future remediation/closing of the three existing unlined landfills on the islands:Waste reduction measures – including waste education and pragmatic waste minimization initiatives (e.g. home composting/material return schemes such as bottles, plastic bag charges).The reuse and refurbishment of bulky waste, waste electrical and electronic equipment (WEEE).Community recycling depots and household waste recycling centre facilities.Transfer and bulking facilities (one per island).The windrow composting of yard/garden waste from landscapers and household waste recycling centres in Grand Cayman and Cayman Brac.The treatment of residual waste in a waste recovery plant (waste to energy facility).Closure of landfills on Little Cayman and Cayman Brac, with waste sent to Grand Cayman for processing.The potential introduction of kerbside yard and garden waste collection (post 2020).The potential introduction of kerbside dry recyclable collections with a materials recovery facility (post 2020). |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Residential, Biomass, Waste Processing and Treatment, Water Supply and Storage, Government, Education, Manufacturing (Industrial) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in UK (United Kingdom)
- Liberton Hospital Site Redevelopment Project
- London South Bank University (LSBU) Technopark redevelopment PPP project
- Runnymede urban regeneration project
- Alton Estate regeneration PPP project in London
- Mixed-use development PPP project in Kent
- North Quay Riverside Area Regeneration Project
- Wythenshawe Civic Regeneration Project
- Newham residential quarter PPP project
