logo
ProjectPending

CB Energy Access

Sector: Warehouse • Location: Africa Region

Source: International Finance Corporation (IFC)

    IFC is proposing to make an equity investment of US$7.5 million in Preference B Shares in the CrossBoundary Access (“Access” or the “Platform”) for its 2024-2026 capital expenditure (capex) plan. This will be accompanied by an equivalent amount of US$7.5 million of concessional equity from Blended Finance in the same share class. Access is a platform using infrastructure project finance princi

Status
Prospective
Sector
Warehouse, Energy Storage, Power Transmission, Power Generation (CCGT), Solar, Government, Waste Processing and Treatment, Residential, Commercial
Location
Unknown (Sub-Saharan Africa)
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about CB Energy Access

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CB Energy Access” is an infrastructure initiative in the Warehouse sector, located in Africa Region. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IFC is proposing to make an equity investment of US$7.5 million in Preference B Shares in the CrossBoundary Access (“Access” or the “Platform”) for its 2024-2026 capital expenditure (capex) plan. This will be accompanied by an equivalent amount of US$7.5 million of concessional equity from Blended Finance in the same share class. Access is a platform using infrastructure project finance principles to build a distributed utility by constructing and acquiring portfolios of bankable and shovel-ready, networked and distributed renewable technologies, consisting of solar hybrid mini-grids (MGs) and other adjacent technologies (i.e. battery swapping hubs, mesh grids, other) in partnership with leading developers across Sub-Saharan Africa. The objective of the Platform is to create a distributed utility at scale for off-grid rural households and businesses.Access will use IFC’s funds to (i) support its capex plan, in line with the planned construction schedules of assets and agreements signed with the selected development partners (“Developers”); (ii) build and acquire new projects in line with the company’s mandate.The proposed MGs have similar layouts and involve the installation and operation of ground-mounted solar modules with a capacity of 50-450 kWp (but future pipeline sites may be larger) and associated components (battery energy storage system (BESS), inverters, cables, hubs, energy management systems and diesel generator systems used for backup during low solar generation days). Project sites are selected on greenfield land, on the outskirts of target communities’ settlements, and typically span 1 to 2 acres. Electricity is delivered via low voltage lines to customers located tens to hundreds of meters away; medium voltage may be used for larger sites or for customer groups located further away from the generation unit. The battery hubs target off-grid low-income villages and consist of standalone solar system of 5-10 kW per hub powering 300 batteries of [45Wh] each available for daily rentals to customers in the community.Access’ existing assets include project development and construction agreements with a Developer for a first batch of (15) projects in Nigeria, of which 5 are already operational, while the remaining 10 are under commissioning. Access is considering additional near-term pipeline development agreements, which involve several MG projects in collaboration with a MG Developer in Nigeria to serve approximately 20,000 connections, and battery swapping hubs (“Power Hubs”) to serve around 60,000 consumers. Further opportunities are under consideration with developers in Madagascar, the Democratic Republic of Congo, Zambia and other African countries. Developers may also construct (via Engineering Procurement and Construction (EPC) contract if necessary) and operate the projects under contract with Access.

Original sector

V-BH - Renewable through Financial Intermediaries - Renewable Energy Generation

Location

Country

Unknown (Sub-Saharan Africa)

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Warehouse, Energy Storage, Power Transmission, Power Generation (CCGT), Solar, Government, Waste Processing and Treatment, Residential, Commercial

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project