logo
ProjectClosed

CB House / Alventosa Morell Arquitectes

Sector: Road

Source: ArchDaily

On the other hand, the existing construction consists of a vertical and horizontal structure with significant pathologies that make its preservation unfeasible. In addition, capillary moisture and lack of light and ventilation make the house completely unhealthy.In summary, through a bioclimatic central space, we not only solve the pre-existing unhealthiness but also create optimal conditions to e

Status
Closed
Sector
Road, Geothermal, Nuclear, Solar, Biomass, Residential, Cement, Commercial
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about CB House / Alventosa Morell Arquitectes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “CB House / Alventosa Morell Arquitectes” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On the other hand, the existing construction consists of a vertical and horizontal structure with significant pathologies that make its preservation unfeasible. In addition, capillary moisture and lack of light and ventilation make the house completely unhealthy.In summary, through a bioclimatic central space, we not only solve the pre-existing unhealthiness but also create optimal conditions to enjoy a home protected from the noise and frantic pace of a big city.This new central courtyard increases its dimensions and becomes the space that organizes the rest of the rooms. At the same time, it provides light, air, radiation, and ventilation through its glass roof.The house occupies, atypically, the block courtyard of one of the plots, with a single front of 8 m facing the street. The existing house only has one facade, and its 3 party walls border the courtyards and garages of neighboring buildings. According to regulations, the 90 m² house can only be developed on the ground floor.The starting point of our project has been to solve all these negative constraints. The solution is achieved through a single movement, the displacement of the existing courtyard towards the center of the house.Strategies for reducing the ecological footprint: wood as the main element in the roof, windows, and interior cladding, masonry walls made from biomass-fired ceramic pieces, and local bóvila, cellulose insulation.Thanks to this passive strategy, we control the interior temperature of the house, maintaining an annual demand of 19 kW/m² and increasing the possibilities of use of the central courtyard. In winter, it is used as an interior space that stores energy thanks to solar radiation and the thermal inertia of the walls, and in summer, it transforms into a new outdoor terrace.Text description provided by the architects.The project consists of the rehabilitation of an old house located in the center ofSabadell. It is a typical location in the city where we find narrow plots facing two streets. The neighborhood is characterized by small buildings between party walls on the ground floor or the ground floor and upper floor.Bioclimatic strategies and building lifespan: bioclimatic courtyard with greenhouse effect, thermal inertia from ceramic walls and concrete slab, high-performance thermal envelope, controlled cross ventilation.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Geothermal, Nuclear, Solar, Biomass, Residential, Cement, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project