CCD Levitt Pavilion at Ruby Hill Park
Sector: Water Supply and Storage • Location: Denver, Colorado, United States of America
Source: Dodge
This project consists of supplying all labor, materials, and equipment necessary for the,installation of (2) VIP patios with drink railing, in-grade lighting with electrical modifications, 8" storm sewer, concrete edger, synthetic turf ground cover, ADA compliant walkway, unclassified excavation & grading and stabilizing a portion of the upper slope within the lower bowl area of Levitt Pavilion. A
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Rail, Commercial, Waste Processing and Treatment, Car parking, Power Generation (CCGT), Automotive, Stadium, Manufacturing (Industrial)
- Location
- Denver, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CCD Levitt Pavilion at Ruby Hill Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of supplying all labor, materials, and equipment necessary for the,installation of (2) VIP patios with drink railing, in-grade lighting with electrical modifications, 8" storm sewer, concrete edger, synthetic turf ground cover, ADA compliant walkway, unclassified excavation & grading and stabilizing a portion of the upper slope within the lower bowl area of Levitt Pavilion. Asbestos abatement may be required as part of the earthwork items. Associated site work includes e... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Denver |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Rail, Commercial, Waste Processing and Treatment, Car parking, Power Generation (CCGT), Automotive, Stadium, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
